14. Etiquette for using a cell phone in Church: Check device settings BEFORE entering the church (most will usually do this on the way to church). Disable the pesky notification center banners, popups, badges, and sounds by switching to airplane mode. As a double precaution, turn vibration off for all events that you normally select to vibrate when on silent mode (incoming calls, emails, etc.). Keep your device out of sight until needed. Reading your messages or Facebook page, just like reading the bulletin during the homily is impolite. Your discretion is called upon in the sacred place.
15. CHURCH AND BUILDING REPAIRS: As you may have noticed there is an ongoing program of repairs being conducted on the property. The entire interior of the Church is having its wall repaired, re-plastered and then completely repainted with a semi gloss white paint. The work is in its ninth week of progress and has had numerous difficult challenges to overcome. In addition the handicap door to the church has been repaired. The Church front door lock and latches have been updated and repaired. The steeple door locks have been rekeyed and repaired. The three outbuildings, Heritage Center, Rectory and Rental Property has had repairs completed to the damaged soffits, gables aluminum siding and gutters. We brought in aerial lifts to complete the work and completely replaced the gutters on the Heritage Center. The Heritage Center also has had some of their aging windows replaced with new energy efficient windows. The property has had all its fire extinguishers upgraded, tested and repaired as needed with additional extinguishers installed to cover all possible issues. An inspection was conducted by the Municipal Fire Marshal. The doors to the church hall have been repaired so that they open and close easier. In the church hall the lower level meeting room has been completely upgraded, repaired and painted with new ceiling tiles installed as part of a mold abatement program. The lower level bathrooms and hallways are in the process of being repainted. And of course you have all noted that the front entrance to the church hall has a brand new burgundy carpet. A special thanks to the KofC member volunteers who provided countless hours of donation labor in helping to complete some of these projects. All these items are in addition to the massive outside repair/protection work that has been conducted this year. The roofs and the blue panel repairs on the church hall. These efforts have been expensive and we are currently facing a severe financial shortfall by end of year. Unfortunate, but necessary to maintain the physical plant of the property. These were items that could not be put off anymore. The delaying of these repairs would only have caused more damage and been more costly in the future. Please take note that there is additional expensive and extensive work scheduled for next year.